A PHP Error was encountered

Severity: Warning

Message: mktime(): It is not safe to rely on the system's timezone settings. You are *required* to use the date.timezone setting or the date_default_timezone_set() function. In case you used any of those methods and you are still getting this warning, you most likely misspelled the timezone identifier. We selected the timezone 'UTC' for now, but please set date.timezone to select your timezone.

Filename: libraries/Session.php

Line Number: 603

A PHP Error was encountered

Severity: Warning

Message: Cannot modify header information - headers already sent by (output started at /hermes/bosnacweb02/bosnacweb02bq/b684/ipg.commissioningstrateg/application/system/core/Exceptions.php:185)

Filename: libraries/Session.php

Line Number: 651

Commissioning Strategies - Commissioning Engineers
COMMISSIONING STRATEGIES
Engineering the Commissioning Process
SERVICES
What can we do for you?

Specialist Commissioning And Validation

Pharmaceutical Commissioning and Validation

Pre commissioning and commissioning of ventilation services, particle counts, DoP Testing

Operating Theatre Commissioning and Validation

Our services range from initial commissioning after installation to annual validation as requested in  HTM 03 part B, 

Advanced Energy Projects

Our engineers have worked on various Advanced Energy projects as part of the Design / Commissioning Team.  We have recorded bespoke documentation to various high end client wishes.

Survey Work

We carry out survey works on existing systems prior to planned modification works.

Ultrasonic Flow Measurements, Dilapidation reports

LEV Testing

Local Exhaust Ventilation (LEV) is a method of reducing workers' exposure to potentially harmful substances generated from the work process. Commissioning Strategies (UK) Ltd can conduct LEV system testing.

In the UK, Control of Substances Hazardous to Health (COSHH) Regulations 2002 require that thorough examination and testing of Local Exhaust Ventilation plant is carried out at least once every 14 months or sometimes at shorter intervals. The Control of Lead at Work Regulations 2002 (CLAW) have similar requirements for examination and testing of local exhaust and ventilation plant.

Stairwell Pressurisation

A major life safety system, stairwell pressurisation is not known by many but can have a significant impact in allowing people to escape from a burning building.  We have commissioned various types of systems including smoke extracts.

Project Management

Our experienced engineers have been called upon by numerous trusted contacts to project manage small HVAC installation and maintenance projects.  We have developed many trusted contacts during our collective years in the industry and can source reliable companies to compliment our service including HVAC Controls, Gas testing, Ductwork and Pipework installation.

Legionella Risk Assessments

Our trained operatives can carry out full Legionella Risk Assessments.

Water Storage Tank refurbishments, cleans and Chlorination

With our specialist partners, we can carry out all remedial tank and pipework works to ensure your domestic water systems are compliant with ACoP L8

Chemical cleaning of existing systems.

Site and laboratory sampling of existing heating and cooling systems to evaluate condition prior to offering any solutions.

Chemical cleaning of existing systems including individual tailored water treatment programmes and chemicals depending on age and system materials.

Dosing of water treatment chemicals - Corrosion Inhibitors, Cleaning Agents, Ethylene Glycol, Propylene Glycol, Biocides.

Re-Commissioning of existing projects

Our experienced engineers can assist in the re-design and re-calculation of existing systems to meet new design or operational criteria.  This has been very effective in the past when a pre site survey has also been carried out.